Locação de uma edificação utilizando tecnica de topografia

6077 palavras 25 páginas
UNIVERSIDADE FEDERAL DE ALAGOAS INSTITUTO DE GEOGRAFIA, DESENVOLVIMENTO E MEIO AMBIENTE CURSO DE ENGENHARIA DE AGRIMENSURA

LOCAÇÃO DE UMA EDIFICAÇÃO UTILIZANDO TÉCNICAS DE TOPOGRAFIA

NEYLO RODRIGUES DE LIMA

MACEIÓ – AL 2011

NEYLO RODRIGUES DE LIMA

LOCAÇÃO DE UMA EDIFICAÇÃO UTILIZANDO TÉCNICAS DE TOPOGRAFIA

Trabalho de conclusão de curso apresentado como requisito parcial para obtenção do título de Bacharel em Engenharia de Agrimensura pelo Instituto de Geografia, Desenvolvimento e Meio Ambiente da Universidade Federal de Alagoas.

Orientador: Prof. M.Sc. Almair Camargos

MACEIÓ – AL 2011

UNIVERSIDADE FEDERAL DE ALAGOAS INSTITUTO DE GEOGRAFIA, DESENVOLVIMENTO E MEIO AMBIENTE CURSO DE ENGENHARIA DE AGRIMENSURA
…exibir mais conteúdo…

Palavras-chave: Topografia, Levantamento topográfico, locação de obras.

ABSTRACT Leasing works is one of the most important applications of topography that can be so easily observed in various works, because to build, for example, is a difficult the necessary authoring mark the axis of the walls, marking the axis of the pillars, among others. The work location is basically the beginning of work, so its proper implementation is critical to the smooth running of it. This work is in the location of the pillars of a building using survey techniques. To achieve the same, was first made a reconnaissance of the area to choose the vertices of the polygon, then the survey was conducted in accordance with norms of ABNT, using instruments like total station, tripod, tape measure, hammer and iron pins. This survey were obtained from angles and distances that define the boundaries of the land. Was then inserted in the architectural design topographic, which were obtained the coordinates of pillars designed in that drawing. Through these points were calculated angles and distances from the pin materialized for the lease of the work. And finally, we made the field work relating to the lease, and to perform the same method was used for the polar system. For marking of each pillar, using the above method, it took an angle and distance from a fixed point on the reference line. In this study we observed high accuracy in the survey, since the

Relacionados

  • Trabalho acadêmico de topografia: locação de pontos
    1494 palavras | 6 páginas
  • Método curral
    2170 palavras | 9 páginas
  • As Built - Normas ABNT
    3630 palavras | 15 páginas
  • locacao com estacao total
    1917 palavras | 8 páginas
  • A topografia
    5842 palavras | 24 páginas
  • Locação de obras
    1612 palavras | 7 páginas
  • EXERCÍCIOS DE TOPOGRAFIA
    1320 palavras | 6 páginas
  • topografia
    1546 palavras | 7 páginas
  • Trabalho de construção civil 1 - movimentaçãode terra, fundação e locação da obra
    3801 palavras | 16 páginas
  • Serviços preliminares
    6671 palavras | 27 páginas